About the Transformer Winding Workshop – MATELEC

Completed in 2011 for MATELEC in Ghorfin, a large span streel structure was engineered and installed by Daher Industrial as an identical counterpart to the transformer assembly hall – purpose-built to house the winding department, which handles the critical upstream stage of the transformer manufacturing process.

Matching the assembly hall in structural dimensions, the workshop spans 25 meters across a 3,125 m2 floor area with a 15-meterpeak height, and accommodates four konecranes overhead cranes with a capacity up to 16 tons, providing full coverage across the production floor for the handling of heavy copper windings, coil assemblies, and associated equipments.

Steel portal frames, a roof truss system engineered for multi-crane dynamic loads, and integrated crane runway beams deliver a high-capacity, process-ready environment built to the same standard as the facilities it servers – demonstrating Daher Industrial’s ability to replicate complex industrial structures at scale with consistent engineering precision.

ClientMatelec Group
CompletedAugust 2011
LocationGhorfin, Amchit, Jbeil
Floor Area3,125 m2
Span25 m
Peak Height15 m
MATELEC Bobinage Factory 1
MATELEC Bobinage Factory 2
MATELEC Bobinage Factory 3
MATELEC Bobinage Factory 4
MATELEC Bobinage Factory 5
MATELEC Bobinage Factory 6
MATELEC Bobinage Factory 7
MATELEC Bobinage Factory 8
MATELEC Bobinage Factory 9
MATELEC Bobinage Factory 10
MATELEC Bobinage Factory 11