About the Transformer Testing Room & Oven Structure – MATELEC

Completed in 2010 for MATELEC in Ghorfin, a 600 m2 steel structure was engineered and installed by Daher Industrial as a direct complement to the adjacent transformer assembly hall – housing the transformer testing room and the industrial oven used in the assembly process, completing the full production workflow within a single integrated facility.

Built with full sandwich panel insulation across walls and roof, the structure was purpose-designed to meet the thermal and acoustic requirements of high-voltage transformer testing, where controlled environmental conditions are critical to accurate results.

A precise-driven structural solution that closes the loop on MATELEC’s transformer manufacturing cycle.

ClientMatelec Group
CompletedAugust 2010
LocationGhorfine, Amchit, Jbeil
Floor Area600 m2
MATELEC Testing Room 1
MATELEC Testing Room 2
MATELEC Testing Room 3
MATELEC Testing Room 4
MATELEC Testing Room 5
MATELEC Testing Room 6
MATELEC Testing Room 7
MATELEC Testing Room 8