About the Transformer Testing Room & Oven Structure – MATELEC
Completed in 2010 for MATELEC in Ghorfin, a 600 m2 steel structure was engineered and installed by Daher Industrial as a direct complement to the adjacent transformer assembly hall – housing the transformer testing room and the industrial oven used in the assembly process, completing the full production workflow within a single integrated facility.
Built with full sandwich panel insulation across walls and roof, the structure was purpose-designed to meet the thermal and acoustic requirements of high-voltage transformer testing, where controlled environmental conditions are critical to accurate results.
A precise-driven structural solution that closes the loop on MATELEC’s transformer manufacturing cycle.
ClientMatelec Group
CompletedAugust 2010
LocationGhorfine, Amchit, Jbeil
Floor Area600 m2







